Release 10.1A: OpenEdge Development:
Programming Interfaces
refresh-db-cache procedure
Call the method that refreshes the database cache with the newly loaded policy settings. This should only be called after a successful call has been made to the import-xml-db procedure or the save-changes-to-db procedure. It is up to the caller to decide if the cache should be refreshed after new policy settings are loaded. See the import-xml-db procedure and the save-changes-to-db procedure for more information.
Parameters:INPUT pcDbName AS CHARACTERLogical name of the database to have its cache refreshed.
OUTPUT perrorMsg AS CHARACTERError messages.
|
Copyright © 2005 Progress Software Corporation www.progress.com Voice: (781) 280-4000 Fax: (781) 280-4095 |